How to solve the problem of crane operating mechanism being out of sync?
During the installation and operation of the crane, the trolley operating mechanism and the car operating mechanism may not run synchronously on both sides of the track, especially when the span (or track gauge) is relatively large. If you encounter such a problem, how to solve it?
1. Determination of asynchronous operation of crane
Characteristics of asynchronous operation failure: the trolley twists or swings forward when starting or running, or the wheels show signs of climbing the tracks ...